Bolivia Hill Upgrade

August 2020 - Current

Located 35km south of Tenterfield, the project involves the construction of 2.1km of new road, a new 320-metre long bridge, wider lanes in each direction and widened road shoulders to improve safety.


Musswellbrook Bridge Replacement


June 2020 - Current

The Project involves replacing the bridges spanning Bridge St, Muscle Creek, and Hunter River. One 26m long single-span concrete bridge will be built over Bridge St and a combined 175m long multi-span concrete bridge will be constructed over Muscle Creek and Hunter River.


Systems Connect Line-Wide

April 2020 - Current

System Connect will design and construct the Line-wide Work to convert the excavated tunnel into a working railway for Sydney Metro City & Southwest, 31 kilometres of underground railway track to be laid in the twin railway tunnels from Chatswood to Sydenham.


Parramatta Light Rail

March 2020 - Current

Parramatta Light Rail is one of the NSW Government’s latest major infrastructure projects being delivered to serve a growing Sydney. Light rail will create new communities, connect great places and help both locals and visitors move around and explore what the region has to offer.


Newell Highway Program Alliance

March 2020 - Current

The construction of a minimum of 45 kilometres of new overtaking lanes to improve safety, reduce travel times, allow more accurate travel planning and improve freight productivity.

The new overtaking lanes are expected to provide around 25 minutes of travel time savings along the length of the Newell Highway from the Victorian border to the Queensland border.


Pacific Highway Upgrade - Tuggerah to Doyalson

December 2019 - Current 

Upgrading the M1 Pacific Motorway between the Tuggerah and Doyalson interchanges to improve traffic flow and safety. The upgrade involves widening the motorway to provide three lanes in each direction and rebuilding the roadway to provide a smoother and more durable surface.


New Tabulam Bridge

November 2019 - Current 

The project consists of for roadworks, bridgework's and associated activities for the realignment of an 830 metre-long section of the Bruxner Highway at Tabulam from east of the Clarence River to just east of the existing Overflow Bridge west of the Clarence River.


Tweed Valley Hospital Development

August 2019 - Current 

A brand new, state-of-the-art hospital with greater capacity and capability to serve the Tweed-Byron community, as well as interim upgrades at The Tweed Hospital.


East End Newcastle Development

July 2019 - Current

Design & Construction of three residential buildings within the Newcastle CBD to create an urban village of contemporary apartments, lane ways & retail.


Sandstone Precinct

April 2019 - Current

The design includes ground-level reception, bars, and dining areas, along with 192 new guestrooms, new glass facade elements, and traditional restoration of existing heritage facades and interior elements.