Musswellbrook Bridge Replacement


June 2020 – Current

The Project involves replacing the bridges spanning Bridge St, Muscle Creek, and Hunter River. One 26m long single-span concrete bridge will be built over Bridge St and a combined 175m long multi-span concrete bridge will be constructed over Muscle Creek and Hunter River.